Coking.com Logo

Seminar Agenda

Home
Seminars
Köln Home
General Information
Program Brochure
Registration Form
Hotel-Hilton Cologne
List of Presentations
List of Exhibits
List of Sponsors
Invoice & Pay Online
Daily Schedule
Spouse Program 1
Spouse Program 2
Z&J Tour
RuhRPumpen Tour
G&G Tour
SES Workshop
Coker Process Training
Course Outline
Register/Pay Online
Training Brochure
Sponsor/Exhibiting Info
Sponsorship Levels
Prospectus and Prices
Apply to Sponsor/Exhibit
Pay Online
Exhibit Floorplan
Exhibit Schedule
Exhibit Setup
List of Exhibits
Presenting Info
Call for Presentations brochure
Apply to Present
Presentation Guidelines
Pay Online
Upload Your PPT File
List of Presentations
Testimonials
Sharing Near Misses
Breakout Group

Coking.com Safety Seminar, Texas
May 2-6, 2011

CatCracking.com Safety Seminar, Texas:
May 2-6, 2011

Sulfur & Amine Seminar, Texas
May 4, 2011

Coking & CatCracking.com Safety Seminar, Europe/Asia
October, 2011

Coking & CatCracking.com Safety Seminar, Latin America
January, 2012


Galveston, Texas USA

-->

Where would you like us to go in 2011? Send us your suggestion.


Cologne Coker Conference
Papers & Presentations

These are the details from the previous seminar. Information for the next seminar will be posted soon.

 

 Company Name
- Since startup of its Delayed Coker in 1984, Company Name operates a completely closed and virtually emission free coke-handling system. Over time the process has become largely automated. Nowadays it is possible to automatically operate and optimize the drum cycle, drum unheading, coke cutting and dewatering, as well as the coke transport. This presentation will give an overview of operational, process safety, and safety aspects of automated delayed coker operation and a closed coke-handling system.

  • Double Disc Triple Seal Unheading Technology - Highlights
  • Customized Compact Dual Actuator design for the delayed coker
  • Introduction to the Company Name Factory Tour with the latest Unheading Equipment. .

 
Company Name Firewalls and Blast Barriers

- Company Name in association with Company Name XY provides blast and fire barriers that can and should be installed in a multitude of areas to protect people and equipment, while also helping to contain the damage to a limited field.

Company Name - Predicting & Preventing Carburisation-induced Failures of Coker Heater Tubes.

Company Name
- Improved valve maintenance and quality for Delayed Coking - An Industry wide Perspective.

Company Name
- Furnace Coatings for heater applications where internal coking in radiant section process tubes reduces run length and restricts throughput. The coating system effectively improves the uniformity of the heat flux distribution and reduces the peak to average flux ratio in process tubes of single fired heaters. This technology reduces the maximum tube skin temperature, increases run length and charge rate.

Company Name
- Bundled Sensor Technology provides reliable, low maintenance furnace feed flow measurements to optimize furnace balance control, reduce tube fouling rates, calculate mass balance/recycle rates and reduce maintenance cost.

Company Name
-Visbreaker to Delayed Coker conversions - feasible and practical.

Company Name
- Fully automated "smart" decoking - a reality utilizing existing drum and monitoring equipment with intelligent control module.

Company Name
- Applying Intelligent Pigging Technology to Inspect Coils in Process Heaters.

Company Name
- Innovative coke drum repairs utilizing Unifuse automated welding equipment.

 Company Name
- In order to both: (A) improve safety (high-level-valve-interlock-system) and (B) maximize feed throughput by optimizing cycle-time, a new control-program has been developed. DDC (dynamic drum control) includes the following subroutines (full-automated sequences for all drum-handling-steps):

  • Drum switching, Disconnecting and Stripping, Quenching, Drilling/Cutting, Pressure test, Connecting and heating up.
  • STO (step time optimizer) to stabilize drum cycle time.
  • DFR (dynamic forecast report) to optimize maintenance activities and minimize feed losses.
  • SFR (schedule feed rate) to meet the integrated production plan.
  • HLI (high level interlock) to rule out the incorrect positioning of gate valves.

 Company Name
- Company Name provides a Hydraulic Decoking System on a high technical level for reliable and safe operation. Remote and automatic decoking are the next steps to increase the performance.

Factory Tour too!

 Company Name
- Since 2001, Company Name has added products to include a top unheading device, auto-switch cutting tool, drill stem guide & blow-out diverter, in-line isolation valve, hydraulic power units & controls, along with turnaround & other field services.

Company Name
- Awarded Environmental Recognition for a Coker Refinery - Award symbolizes relationship: a refinery (with a DC), environment, and community. It represents a story within a story: journey of environmental improvement, community outreach, sustainable development along with construction of a DC during this journey.

Company Name
- Coke Drum Design & Life Extension. Design improvements addressing fatigue cycle life, materials, weldability, thickness, toughness and resistance to embrittlement and how to improve your drum design.

Join SES on Friday for an Acoustic Emission Workshop.


We know that you like to hear how other refiners are handling safety situations, so we offer these Breakout Discussion Groups focused on:

  • Safety

  • Operations

  • Maintenance/Reliability

  • Process

We'll add additional papers as they are received.

Seminar Schedule

Register multiple attendees here.

Pay here with


Send mail to CompanyWebmaster with questions or comments about this Delayed Coker (www.coking.com) web site.
© Copyright: December 22, 2009 04:17 PM