[ Reply | Next | Previous | Up ]
From: Coker Squirrel
Category: Safety
Date: 09 Jan 2005
Happy New Year CAT! The primary objective is to reduce coke lay-down (coking) in the tubes, not external deposits on the tubes. This would extend run lengths between spalling. Another benefit would be a lower tube skin temperature. This would extend the life of the tubes.