Coking.com Logo

Home
Worldwide Conferences
 Canada
 Latin America
 USA
Coker Training CAN
Coker Training EUR
Coker Training USA
Discussion Forum
Products & Services
Best Practices
Safety
Coker Jobs
Refinery Jobs
Person of the Year
EPA/OSHA Bulletin
Mgmt of Change
Reliability
Featured Cokers
Testimonials
Links
Coker History
Refinery Contacts
Contact Us
Coker News
Refinery News
Old Discussion

www.Coking.com

HAZOP

HAZard and OPerability

Some problem at a downstream unit prevented us from slopping coker gas oil (CGO) for a period of time. To solve the problem a tanker was pulled up for slop catchment. A flexible hoze was attached to the vent line of the CGO slop line, and fitted with a valve.

Two days later one of the Process Controllers was injured (minor burn injuries) when the tanker primed during slop action.

Lessons learned:

1. ALWAYS do a HAZOP! No matter how menial the task seems.

2. Make sure that the people have the RIGHT safety equipment for the job.

3. NEVER do an alteration without consulting the owner of the process i.e. the Process Controller.

Thanks to Marius Grobler for contributing this article.

Send mail to CompanyWebmaster with questions or comments about this Delayed Coker (www.coking.com) web site.
© Copyright: June 09, 2008 01:47 AM